Products such as correspondence lifts, conveyors, chutes, pneumatic tube systems, material handling cranes and hoists, as well as other items specified in this division, may require trained installers. The general contractor may not have any choice as to who will perform the installation or when it will be performed. Long lead times are often required for these products, making early decisions in purchasing and scheduling necessary. The installation of this type of equipment may require the embedment of mounting hardware during construction of floors, structural walls, or interior walls/partitions. Electrical connections will require coordination with the electrical contractor.